The Ermida power plant is located on the Pombeiro River, a tributary of the Paiva. Construction of the plant began in January 1992 and the facilities began operating in May 1993. The plant is equipped with one Pelton turbine and has an installed capacity of 7.6 MW with an expected annual production of 18.7 GWh (average is 18.4GWh). Head is 387m and flow 2.35 m3/s. The concession was granted in December 1993 and matures in 2028.