TF: +34 918 319 215

Mapa Activos RPI Energías Renovables

Central Hidroeléctrica de Cebolla


Run-of-river plant on the Tajo river, in the Cebolla municipality. It was built and put in operation by RPI in 1991. It has 1.5 MW, with two semi-kaplan groups. Head is 2.5 m and flow 60 m3/s.