TF: +34 918 319 215

Mapa Activos RPI Energías Renovables

Central Hidroeléctrica de Flix


In 1995, Micdos acquired from FECSA (today Endesa) a perpetual easement on a 40MW run-of-the-river power plant located at Flix, on the Ebro River in Tarragona, and owned by Endesa. Through this easement, Micdos is entitled to receive from Endesa a guaranteed volume of energy of 63.7 GWh per annum at a constant power of 10.0MW, until the end of the concession in 2047. This output is supplied regardless of whether the plant operates or not and the easement would remain in effect should Endesa sell the plant to another operator.