TF: +34 918 319 215

Mapa Activos RPI Energías Renovables

Central Hidroeléctrica de Higares


Run-of-river plant on the Tajo river, in the municipality of Mocejón. It was built and put in operation by RPI in 1992. It has 1.6 MW, with two semi-kaplan groups. Head is 2.5 m and flow 60 m3/s.