TF: +34 918 319 215

Mapa Activos RPI Energías Renovables

Central Hidroeléctrica de Lavaderos


Run-of-river plant on the Tajo river, in Toledo, practically built in the city. It was refurbished by RPI in 1991. It has 1.5 MW, with two semi-kaplan groups. Head is 1.95 m and flow 50m3/s.