TF: +34 918 319 215

Mapa Activos RPI Energías Renovables

Central Hidroeléctrica de Villaverde


Run-of-river plant on the Tajo river, in the Santa Cruz de la Zarza municipality. It was built and put in operation by RPI in 1995. It has 900 kW, with two kaplan groups. Head is 3.75 m and flow 50 m3/s.